What an as-built survey is
An as-built survey shows the real position of the completed works: exactly where the building is, at what height, and where the pipes and cables run. It is compared with the approved design and forms part of the documents when construction is completed.
For underground utilities (water, sewers, cables) the survey must be done before the trench is backfilled; afterwards it is difficult or impossible.
When you need it
When a building is commissioned.
When water mains, sewers, gas pipes or cables are laid.
When the investor wants an independent check of the works.
Documents required
the approved design (to compare what was built with what was designed);
a construction permit;
for utilities: the design and route data.
What an as-built survey contains
the outline and position of the building relative to the plot boundaries;
the finished floor level and key heights;
the routes, depths and diameters of the underground utilities laid;
manholes, inspection chambers and connection points;
a comparison with the approved design, if requested.
Common mistakes
The most common mistake is backfilling the trench before the utility line has been surveyed. The route can then only be estimated, and during future repairs nobody knows exactly where the pipe or cable runs. The second most common mistake is ordering the survey only when the documents are filed, when the works can no longer be checked.
What an as-built survey contains
the outline and position of the building relative to the plot boundaries;
the finished floor level and key heights;
the routes, depths and diameters of the underground utilities laid;
manholes, inspection chambers and connection points;
a comparison with the approved design, if requested.
Common mistakes
The most common mistake is backfilling the trench before the utility line has been surveyed. The route can then only be estimated, and during future repairs nobody knows exactly where the pipe or cable runs. The second most common mistake is ordering the survey only when the documents are filed, when the works can no longer be checked.
How the work proceeds
01
Request
You tell us what needs surveying and when, especially while trenches are open.
02
Surveys
We measure the completed buildings, utilities and structures.
03
Processing
We draw up the as-built survey in the cadastre's coordinate system.
04
Delivery
We deliver the survey for the construction documents and the cadastre.
Timeframe
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.
We use necessary cookies to make the site work. With your consent we also use Google Analytics for visitor statistics and show the Google Maps map. You can change your choice at any time. Cookie Policy