Construction
Survey support for construction in Varna and the region: from the building line and the setting-out of axes to benchmarks, volume calculations and as-built surveys.

For construction companies, investors and private individuals building a house or a building. We have also worked on large industrial sites, for example setting out anchor groups for a 100-metre steel structure at Devnya Cement and monitoring deformations at the Maritsa East 2 power plant. See our completed projects.
An error in setting out the axes at the first slab carries through to every floor above. That is why we check positions and levels at every key stage: excavation, foundations, columns, slabs. Checking during construction is far cheaper than fixing things afterwards.
On industrial sites, such as steel structures and machine foundations, the accuracy requirements are higher. There we set out anchor groups and monitor deformations during installation and operation.
An error in setting out the axes at the first slab carries through to every floor above. That is why we check positions and levels at every key stage: excavation, foundations, columns, slabs. Checking during construction is far cheaper than fixing things afterwards.
On industrial sites, such as steel structures and machine foundations, the accuracy requirements are higher. There we set out anchor groups and monitor deformations during installation and operation.
We establish a site control network and benchmarks.
We set out the building line and the outline of the building.
We set out axes, columns and levels at every stage of construction.
When the works are finished we survey what was built for the documents and the cadastre.
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.
We use a range of high-precision equipment, including GPS, total stations and drones, to provide accurate and reliable survey data.
Yes. Our projects include Devnya Cement and the Maritsa East 2 power plant.
When the construction site is opened, before excavation starts. Without it construction cannot legally begin.
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.