Cadastre
We add buildings, extensions and separate units to the cadastral map in Varna and the region: from the on-site survey to the amendment project and the new sketches and schemes.

A building missing from the cadastral map causes problems with sales, mortgages, inheritance and commissioning. Notaries and banks check the cadastre data, and a scheme of a separate unit can only be issued for a unit that is on the map.
A building is added through a cadastral map amendment project prepared by a licensed surveyor. Once the project is approved, the building receives an identifier and sketches of the building and schemes of the units in it can be issued.
In a block of flats, each apartment, office, shop, garage or studio is a separate unit with its own identifier. Units are added according to the approved architectural floor plans, and their areas are checked against the ownership documents. If anything changed during construction, it must be reflected in the documents, otherwise the schemes will not match reality.
When only one unit in the building is recorded incorrectly, the whole building does not need reworking: the amendment can cover just that unit.
In a block of flats, each apartment, office, shop, garage or studio is a separate unit with its own identifier. Units are added according to the approved architectural floor plans, and their areas are checked against the ownership documents. If anything changed during construction, it must be reflected in the documents, otherwise the schemes will not match reality.
When only one unit in the building is recorded incorrectly, the whole building does not need reworking: the amendment can cover just that unit.
We check what is recorded, what is missing and whether the documents are sufficient.
We measure the building on site and tie it to the cadastral map.
We prepare the project, the sketch project and the scheme projects for the separate units.
Once the Geodesy, Cartography and Cadastre Office has recorded the amendment, a sketch of the building and schemes of the units are issued.
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.
For buildings without building permits another proof of legality is usually needed, such as a certificate of tolerance. That is why we review the documents first and tell you whether the building can be added.
Yes. Each separate unit (apartment, office, garage, studio) receives its own identifier and scheme. Units are added according to the architectural plans and the ownership documents.
Commissioning requires the building to be shown on the cadastral map. That is why it is added after construction is complete, together with the as-built survey.
The timeframe depends on the size and complexity of the task and on your specific requirements. We will give you a timeframe together with our quote. The time the relevant institution needs to review the documents comes on top of that.